500TPD CIL Tailings Gold Processing Plant

I. Feeding & Grinding Section(Feed particle size: ≤16mm; Product particle size: -0.074mm accounting for ≥90%; Processing capacity: 21 tph)II. Leaching Section(Processing capacity: 21 tph; Leaching time: 36 hours; Leaching rate: 92.5%; Adsorption rate: 95%)III. Desorption, Electrowinning &

Contact Us

E-mail:service@cantonu.com

500TPD CIL Tailings Gold Processing Plant

Details

2.jpg

I. Feeding & Grinding Section

(Feed particle size: ≤16mm; Product particle size: -0.074mm accounting for ≥90%; Processing capacity: 21 tph)

II. Leaching Section

(Processing capacity: 21 tph; Leaching time: 36 hours; Leaching rate: 92.5%; Adsorption rate: 95%)

III. Desorption, Electrowinning & Carbon Regeneration Section

(500 kg/batch of gold-loaded carbon; Electrowinning rate: 95%)

IV. Tailings Dewatering Section

(Processing capacity: 21 tph; Feed moisture content: 60%; Discharge moisture content: approx. 20%)

V. Gold Slag Smelting Section

(Producing crude gold bullion with a grade of 60-70%)

VI. Auxiliary Section – Water Pumps & Slurry Pumps

VII. Electrical, Instrumentation & Automation Control